TODOs for June Deliverable
Milestones:
Date | Milestone |
---|---|
07.06 | Tutorial date |
28.05 | VM ready for tutorial (production) |
28.05 | Deployable system / All software is released (tagged) for HES-SO tutorial |
21.05 | Fix bugs & rewrite tutorial |
09.05 | Tutorial at Idiap with Conda packages (beta) |
07.05 | First version of deployable system based on Conda (all packages) |
23.04 | Feature freeze |
04.04 | Encode DCT-GMM-based Face verification (#80 (closed)) |
28.03 | Encode AT&T-based Eigenfaces (from bob.bio.base) (#58 (closed)) |